Construction Of 3Rd Line Between Naupada (Nwp) And Vizianagaram (Vzm): (Package:03). Execution Of Earthwork In Formation, Blanketing, Minor Bridges (Excluding Major Bridges With Formation In Approaches For 100 Meters Length On Either Side And Other Connected Protection Works) Lcs, Lhs, Rubs, Drains, Protection Works, Fobs, Service Buildings, Platform Works, Passenger Amenities, Track Ballast Supply, P.Way Works And Other Connected Ancillary Works Etc,. Along With Ohe & General Electrification Works And S&T Utility Shifting Works In Connection With 3Rd Line Between Naupada Jn. (Nwp-Km:702.20) Excluding To Km:740.00 (Including Urlam Station) Of Waltair Division In East Coast Railway.
Solicitud de ofertas
Tratamos lo mas posible de tener la información mas actualizada y detallada en nuestro sitio Web pero no podemos garantizar que toda la información dada está libre de errores.
Si tiene una sugerencia para corregir/actualizar este aviso, por favor háganoslo saber.
