Búsqueda

Pre-qualification / Initial Selection for Rehabilitation / Construction of Civil Works, alongwith Design Supply, Installation, Testing & Commissioning of Electrical & Mechanical Works of Dargai Hydroelectric Power Station and Clearance of Defect Liabilities (EXPIRED)

Solicitud de Expresiones de Interés

Información general

Pakistán
   District (Malakand), Tehsil (Dargai)
   C-E & M / HS – 61 / IFIS - 001
   25 de Ene, 2022
15 de Feb, 2022
  
PAKISTAN - Water and Power Development Authority
   (i) The Applicant shall demonstrate that it has access to, or has available, liquid assets, unencumbered real assets, lines of credit, and other financial means (independent of any contractual advance payment) sufficient to meet the cash flow requirements estimated as US$ 2 Million for the subject contract(s) net of the Applicants other commitments.
Minimum average annual turnover of US$ 10M (Ten Million USD) for the last 5 years.
A minimum number of similar contracts specified below that have been satisfactorily and substantially completed as a prime contractor, joint venture member management contractor or subcontractor between 1st July 2011 and application submission deadline: 2 contracts, each of minimum value US$ 12 Million that have been successfully and substanitally completed and are similar to the proposed works. Out of 2 projects, one project should be substantially completed by the bidder outside their home country. The similarity shall be based on the physical size, complexity and technicity of the Works.
Construction and/or Rehabilitation of power channel and/or spillway chute and/or similar hydraulic structure with shotcrete and/or plain concrete and/or reinforced concrete lining and construction of cross drainage works that have been satisfactorily and substantially completed.”
Design, supply, installation, testing and commissioning of hydropower plant of 15 MW (generating unit size should not be less than 5MW having Francis type turbine) or higher rating with following equipment / components which are performing satisfactorily for consecutive two years:
- Hydraulic Turbine Generating Units;
- Turbine Governors, Main Inlet Valves, EOT cranes;
- Balance of Plant E&M Equipment;
- 132 KV or higher substations;
- Power Transformers;
- SCADA and Protection.
   Inglés
   Licitación Internacional
   publicado: 25 de Ene, 2022

Datos para contacto

   Muhammad Arfan
General Manager
Water and Power Development Authority
104 - WAPDA House Lahore
Lahore, Punjab 54000
Pakistán
   +924299202189
   +924236369004
   Presione aquí

Tareas

Trabajos de construcción de estructuras hidromecánicas Trabajos de construcción de centrales hidroeléctricas Trabajos de construcción de represas, canales, acequias y acueductos

Documentos de licitación y ficheros adjuntos

 
  • Solicitación (1424 KB; 25 de Ene, 2022)
     Descargar documentos

Texto original

Por favor note que este aviso es únicamente para su información.
Tratamos lo mas posible de tener la información mas actualizada y detallada en nuestro sitio Web pero no podemos garantizar que toda la información dada está libre de errores.
Si tiene una sugerencia para corregir/actualizar este aviso, por favor háganoslo saber.