Component 3.1 – Treated Water Primary Distribution Pipelines (EXPIRED)

Solicitud de ofertas

Información general

Bangladesh
   Dhaka
   46.113.620.00.00.099-2018/C-3.1/34
   18 de Nov, 2023
21 de Dic, 2023
  
BANGLADESH - Dhaka Water and Sewerage Authority - DWASA
   Average Annual Turnover: The minimum annual average construction turnover shall be Euro 45 (forty - five) million in the last 5 years.

Financial Capabilities: Access to financial means sufficient to meet the construction cash flow requirements estimated as Euro 8 (eight) million for the subject contract net of the Bidder’s other commitments.

Contracts of Similar Size and Nature:
• Participation in at least one Reference Contract, comprising civil works in water sector that have been satisfactorily and substantially completed by the Bidder as a prime contractor, joint venture member, management contractor or subcontractor within the last 10 years prior to the bid submission date, wherein the Bidder’s participation exceeds Euro 50 million.
• Participation in at least two Reference Contracts that have been successfully or substantially completed within the last 10 years prior to the bid submission date, where scope of works under each contract includes management and supervision of procurement and supply, installation, testing, disinfection, pre- commissioning and commissioning of more than 10 km of pipeline for potable water supply in carriageways and where at least one contract shall have used minimum 5km of ductile iron pipe of minimum diameter DN1200.
• Two Reference Contracts, each that were completed within 10 years of the date for submission of bids each including design and construction of tunneled crossings of major water courses or utilities including motorways or railway tracks (each using either a slurry or earth pressure balance-based system); and whose scope shall have included construction of shafts of rectangular or circular form with a minimum outside dimension greater than 4m and depth greater than 6m and tunnel drives of finished internal diameter greater than 1200mm and length greater than 20m.
   Inglés
   Licitación Internacional
   publicado: 18 de Nov, 2023

Datos para contacto

   Md. Mustafizur Rahaman
Saidabad Water Treatment Plant Project Phase III
Office of the Project Director, Saidabad Water Treatment Plant Project Phase III,
WASA Bhaban, 98, Kazi Nazrul Islam Avenue (8th Floor), Kawran Bazar, Dhaka-1215 - Bangladesh
Dhaka, Dhaka 1215
Bangladesh
   + 88 01710229986
   Presione aquí
   https://dwasa.org.bd/site/view/tenders

Bienes, Obras y Servicios

Additional resources

Texto original


More information: Presione aquí
Por favor note que este aviso es únicamente para su información.
Tratamos lo mas posible de tener la información mas actualizada y detallada en nuestro sitio Web pero no podemos garantizar que toda la información dada está libre de errores.
Si tiene una sugerencia para corregir/actualizar este aviso, por favor háganoslo saber.