Project E&S Support Consultancy: Environmental & Social Impact Assessment (Esia) & Resettlement Plans (Rps) For Wereilu 132Kv; Kemise-Mehal Meda 132Kv And Gebre Guracha-Fiche-Alem Ketema 230Kv Power Transmission Project (EXPIRED)

Solicitud de Expresiones de Interés

Información general

Etiopía
   ET-EEP-405311-CS-QCBS
   22 de Feb, 2025
18 de Mar, 2025
  
Ethiopian Electric Power
   Inglés
   Otros
   publicado: 22 de Feb, 2025

Datos para contacto

   Tsion Birhanu
Ethiopian Electric Power
P.O Box 15881
Etiopía
   +251115580597
   Presione aquí

Tareas

Servicios de asistencia social y servicios conexos Servicios de asistencia social

Additional resources

Resumen

      

notice_summary_english: Project E&S Support Consultancy: to conduct Environmental & Social Impact Assessment (ESIAs) & Resettlement Action Plans (RAPs) For Wereilu 132kV; Kemise-Mehal Meda 132kV and Gebre Guracha-Fiche-Alem Ketema 230kV Power Transmission Projects (PTP)
Reference No. ET-EEP-405311-CS-QCBS
The Federal Democratic Republic of Ethiopia /Recipient/ has received financing from the World Bank toward the cost of the Power Sector Reform, Investment and Modernization in Ethiopia (PRIME-1) and intends to apply part of the proceeds for consulting services.
The consulting services (“the Services”) include but not necessarily limited to hereafter to conduct ESIA studies in order to make the projects environmentally and socially acceptable. It is the responsibility of the consultant to ensure the project complies with the country’s legal guidelines and the World Bank environmental and social standards policies and requirements; identifying gaps in compliance, if any. And also, overall detail study of Resettlement Plans (RPs) in the target project areas. Consultant’s investigation for the resettlement action plan involves conducting census of the affected persons and assessing socioeconomic conditions, identifying the vulnerable groups including special assistance they require, examining the legal framework, evaluating impact on land and natural resources (both private and public), assess the scope of displacement (economic and physical) and involuntary resettlement, conducting stakeholder analysis, developing livelihood restoration measures, establishing a functional grievance redress mechanism, and designing a monitoring and evaluation framework. The proposed transmission line route and associated substations will be provided to give a guideline of the facilities to be studied.
The detailed Terms of Reference (TOR) for the assignment can be obtained refer to the following website: www.eep.com.et or can be obtained at the address given below.
The Ethiopian Electr

Texto original


More information: Presione aquí
Por favor note que este aviso es únicamente para su información.
Tratamos lo mas posible de tener la información mas actualizada y detallada en nuestro sitio Web pero no podemos garantizar que toda la información dada está libre de errores.
Si tiene una sugerencia para corregir/actualizar este aviso, por favor háganoslo saber.